Global Tasks

Global Tasks

this section contains als the tasks/todo's

Build log (1)BOM (1)Knowledge (1)Tasks (14)
21 tasks
New Stick system T-11 Open hardware HIGH

create new section for that

New rudder system T-10 Open hardware HIGH

- movable - new structure - hal sensors - create new section for that

design push/pull automatic ciruit braker T-49 Open NORMAL
Add Elevator trim motor T-15 Open hardware NORMAL
MIP lighting T-9 Open hardware NORMAL

led strip?

Add Instructor Station T-3 Open software NORMAL
Add EFB T-2 Open software NORMAL

- Navigraph implementation - Beyond ATC - Simbrief - FSLTL - Add-onn maganer

Better MSFS2024 startup T-1 Open software NORMAL

- auto start DA62 - auto popup panels

Change potmeters for hall sensors T-20 Open LOW

for: throtthle left/right rudder trim elevator trim or maybe change input to ADS1115 instead of standard esp32 analog inputs

Add simulator panel T-18 Open hardware LOW

panel with specific simulator functions, like: - pause - restart - other functions? or use a touch screen/tablet for this?

Add Motion G-seat T-17 Open hardware LOW
Copilot side T-14 Open hardware LOW
Improve chair T-13 Open hardware LOW

Use of Motion G-Seat

Add Buttons Aux pumps T-6 In progress hardware LOW

buttons added require wiring

Buttons lights T-5 Completed hardware HIGH

design and 3d print 4 buttons

Text panels MIP T-4 Completed hardware HIGH

- panel lights - panel ECU -> Done - panel engine start -> Done - panel gear -> Done - panel flaps -> Done - panel potmeters -> Done

Arm rest console T-12 Completed hardware NORMAL

- movable up/down

Fill right panel opening T-8 Completed hardware NORMAL

Added Samsung tab2 for sim control need more functions like instructor station items

Add Standby instruments T-7 Completed hardware NORMAL

Use samsung S8 samsung s8 added

MCP read-only permission test T-52 Cancelled LOW

Temporary test task requested by the project owner to verify whether Buildory blocks MCP writes when the project is configured as read-only.

create compas T-19 Completed hardware LOW

Build Log

1 entry

MCP integration verified

Aug 10, 2026

Project reading, searching, task updates, BOM creation, and knowledge capture were successfully tested.

Bill of Materials

1 item
Part Qty Unit price Total Supplier Status
USB cable
2.0 โ€” โ€” โ€” Candidate

Knowledge

1 item
๐Ÿ“
Plugin review context

This project is used to verify Buildory's authenticated MCP read and permission-controlled write workflows.